About:dokauk
Posts by dokauk :
- How to build a hydroelectric plant at temperature – 40 º C ?, Posted on in Blog Doka UK&Doka Formwork and Doka Concremote&DOKA FORMWORK HYDROELECTRIC PLAN IN ICY NORTH&DOKA UK&FORMWORK FORUM
- Reduces the pay gap between men and women within the construction sector, Posted on in Blog Doka UK&DOKA UK&FORMWORK FORUM DOKA UK&FORUM DOKA UK&Gender pay gap at 16.3% for construction sector
- Construction Digital Future: Will formwork speak with a data platform to calculate critical performance parameters?, Posted on in Blog Doka UK&concrete&DOKA UK&DOKA UK BLOG&FORMWORK FORUM&Imagining Construction´s Digital Future
- 52 metres to complete the Queensferry Crossing, Posted on in Blog Doka UK&DOKA UK&FORMWORK FORUM&FORMWORK FORUM DOKA UK&Formwork Planning&FORTH REPLACEMENT CROSSING 2017&Queensberry Crossing 52 metres from completion