The Formwork Experts

‘New but Old’ Maturity Method of Measuring Concrete Strength (and Part 2)

Doka’s Concremote product and data driven service conforms to all of these International Standards and the Concremote sensors measure simultaneously the in-place concrete and ambient temperatures and time and compares this real-time data against a known calibrated concrete mix results and raises real time alerts when the required in-place target concrete strength is reached. Facilitating the optimization of on-site production activities […]

Continue Reading »

“New but Old”: Maturity Method of Measuring Concrete Strength

This analysis provides an introduction to the maturity method for establishing in-place strength development of concrete during construction. The proper application of this simple procedure can result in savings by allowing construction operations to be performed safely at the earliest possible time. […]

Continue Reading »

What solutions need Construction after Brexit?

The construction sector in the UK need an urgent public investment strategy and a dynamic response of the private sector. So far, this analysis we will summarize the first results recorded by this sensitive market. […]

Continue Reading »

A new era for public transportation in Scotland: Forth Replacement Crossing 2017

Update on September 21, 2016, Construction Enquirer: Queensferry bridge sets record as longest free-standing cantilever Contractors building the £1.3bn Queensferry Crossing have set a new record by creating the the longest free-standing cantilever in the world at 644m. The structure will become the longest three-tower, cable-stayed bridge in the world. The bridge deck sections are edging closer and closer by […]

Continue Reading »